General Rates

The wholesale power cost tracker of $0.002644 is added to your kilowatt hour charge. Wholesale Power Tracker is a pass-through charge from our power supplier based on fluctuations in the cost of power. This charge can change month to month depending on market conditions.

General Service – Single Phase

Access Charge – $36.00 per month
Energy Charge – $0.113860 per kWh
Additional Capacity Charge – $0.200000 per kVA over 15
Plus or minus Wholesale Power Tracker

General Service Single Phase GS (PDF)

General Service Demand – Single Phase

Access Charge – $40.00 per month
Transformer kVA greater than 25 kVA and less than or equal to 75 kVA:
Energy Charge – $0.077386 per kWh
Demand Charge – $7.70 per kW
Transformer kVA greater than 75 kVA:
Energy Charge – $0.072175 per kWh
Demand Charge – $ $9.20 per kW
Additional Capacity Charge – $.200000 per kVA over 15
Plus or minus Wholesale Power Tracker

General Service Demand — Schedule GSDMD (PDF)

Excess Distributed Generation

Excess Distributed Generation Rate – $0.0558340 per kWh

Excess Distributed Generation – Rider EDG (PDF)

Excess Distributed Generation – Time of Use

Excess Distributed Generation Rate:
During On-Peak Hours – $0.063500 per kWh
During Off-Peak Hours – $0.052727 per kWh
During Super Off-Peak Hours – $0.040810

Excess Distributed Generation Time of Use – Rider EDG-TOU (PDF)

Pre Pay – General Service

Access Charge – $1.21 per day
Energy Charge – $0.113860 per kWh
Additional Capacity Charge – $0.200000 per kVA over 15
Plus or minus Wholesale Power Tracker

Pre Pay General Service — Schedule PPGS (PDF)

Pre Pay – General Service Demand

Access Charge – $1.33 per day
Transformer kVA greater than 25 kVA and less than or equal to 75 kVA:
Energy Charge – $0.077386 per kWh
Demand Charge – $7.70 per kW
Transformer kVA greater than 75 kVA:
Energy Charge – $0.072175 per kWh
Demand Charge – $ $9.20 per kW
Additional Capacity Charge – $0.200000 per kVA over 25
Plus or minus Wholesale Power Tracker

Pre Pay General Service Demand — Schedule PPGSD (PDF)

General Service – Single Phase Time of Use

Access Charge – $36.00
On-Peak Energy Charge – $0.452630 per kWh
Off-Peak Energy Charge – $0.078410 per kWh
Super Off-Peak Energy Charge – $0.066490 per kWh
Additional Capacity Charge – $0.200000
Plus or minus Wholesale Power Tracker

General Service – Single Phase Time of Use Schedule GS TOU (PDF)

General Service Demand – Single Phase Time of Use

Access Charge – $40.00
Transformer kVA greater than 25 kVA and less than or equal to 75 kVA -Demand Charge – $7.70 per kWh
Transformer kVA greater than 75 kVA -Demand Charge – $9.20 per kWh
On-Peak Energy Charge – $0.320160 per kWh
Off-Peak Energy Charge – $0.052660 per kWh
Super Off-Peak Energy Charge – $0.040810 per kWh
Additional Capacity Charge – $0.200000
Plus or minus Wholesale Power Tracker

General Service Demand – Single Phase Time of Use Schedule GSDMD-TOU (PDF)

Small Power – Multi Phase

Access Charge – $100.00
Energy Charge – $0.055890 per kWh
Demand Charge – $11.05 per kW
Additional Capacity Charge – $0.200000 per kVA over 25
Plus or minus Wholesale Power Tracker

Small Power Service — Schedule SPMP (PDF)

Large Power

Access Charge – $125.00
Energy Charge – $0.059820 per kWh
Demand Charge – $15.11 per kW
Minimum Additional Charge of $0.20 per kVA
Plus or minus Wholesale Power Tracker

Large Power Service — Schedule LPS (PDF)

Irrigation – Load Control

Access Charge – $40.00
Energy Charge – $0.076639 kWh
Demand Charge (May-Sept) – $5.00 per kW
Demand Charge (Other Months) – $7.25 per kW
Additional Capacity Charge – $0.20 per kVA over 15
Plus or minus Wholesale Power Tracker

Irrigation Load Control — Schedule IRLC (PDF)

Irrigation

Access Charge – $40.00
Energy Charge – $0.076639 per kWh
Demand Charge – $7.25 per kW
Additional Capacity Charge – $0.20 per kVA over 15
Plus or minus Wholesale Power Tracker

Irrigation — Schedule IR (PDF)

Small Power – Multi Phase Load Control

Access Charge – $100.00
Energy Charge – $0.050680 per kWh
Demand Charge (May-Sept) – $5.30 per kW
Demand Charge (Other Months) – $8.10 per kW
Additional Capacity Charge – $0.200000 per kVA over 25
Plus or minus Wholesale Power Tracker

Small Power Multi-Phase Load Control — Schedule SPLC (PDF)

Small Power – Multi Phase Low Load Factor

Access Charge – $100.00
Energy Charge – $0.050680 per kWh
Demand Charge – $11.50 per kW
Additional Capacity Charge- $0.200000 per kVA over 25
Plus or minus Wholesale Power Tracker

Small Power Multi Phase Low Load Service — Schedule SPLL (PDF)

Outdoor Lighting Service

55 Watt LED – $9.55 per month
350 Watt LED Floodlight – $31.10 per month

Security Light — Schedule SL (PDF)

Unmetered Sewer Grinder Pump Electric Service

Fixed Charge – $2.10 per Grinder

Unmetered Sewer Grinder Pump – Schedule GP (PDF)

Geothermal Loop Program

Monthly Rate:
Horizontal System – $7.50 per ton
Vertical System – $15.00 per ton

Geothermal Loop Program – Rider GLP (PDF)

Coop Solar Rates

Solar Rates page

Coop Solar Subscription Agreement Option A (PDF)

Coop Solar Subscription Agreement – Option B (PDF)

Coop Solar Subscription Agreement – Option C (PDF)

Other Documents

Grinder Rate Schedule GP (PDF)

APPENDIX A – 01-2012 (PDF)

APPENDIX B – 05-2023 (PDF)